A new polytunnel has been built. The site was measured up, dug over, and leveled. Next the central path was built using large pavers.
Using old scaffolding planks, the large bed was built covering all of one side of the poly tunnel.
The poly tunnel is now finished. It gets very hot, so shading cloth has been put up and the doors to allow ventilation.
With the beds filled up with compost, various plants have been put in including tomatoes, lettuce, and besides the beds chilli plants have been added.