Our work at Easter Inch Moss continued this week, with our excitement peaked by the arrival of the long awaited plastic dams. We were installing several of these along some of the major drainage ditches to help with increasing the water level across the area. Installation involved some handy digging and then carefully using giant plastic-headed hammers to get the piling into the correct position. The sunny weather helped us all enjoy a very rewarding day!