Today we returned to Belhaven for what we think will be the final time. There were a number of small jobs that needed to be done to complete the project; we finished topping the path with wind dust, trying to make it a level as possible, we put a layer of wind dust through the poly tunnel, a couple of edging boards had been damaged, these were replaced and some parts of the path needed the earth banked up on either side with turf. At the end of the day we packed up the wheelbarrows (that had been living at Belhaven for many months) and left the site for the last time. This has been a great project for everyone involved and we all felt very happy that we have been able to be involved with something so substantial that is going to benefit a local community.