We arrived to see we were not the only group out to help. We were joined together with a youth group which made us very happy as once again not only did we have more hands we had the sun on our side!
We continued on as the paths are still growing.
the day was a good but a challenging day, as Materials failed to arrive on site. We also had a to concider that there was a tractor to come through and plow the field which made things a little tricky as the tractor would destroy our path that we would have constructed.
So we put our minds to work and we decided to place in a ground level path in stead of a raised path. Thus allowing the tractor to be able to driver over and not destroy any of our nice and tidy work. Various sections of the paths we added onto and got some landscape fabric down so that it’s ready for when we return hopefully with some type 1/wind dust