We were going to put wood down between the four beds at the community hall but after the scarecrows were burnt we have plumped for stones and sand. The builders suppliers delivered on time this morning but left 5 tons of stones and 2 tons of sand at the road side. This meant we had to shovel the stones into wheel barrows and wheel them down to the beds. I think a few of us felt this as we got through the bags in no time at all. I was sure Danny was training for the Olympic weightlifting team by the rate he started at! We got the job done in great time and finished off by laying two slabs on the steps outside the hall.